View Single Post
  #5   Spotlight this post!  
Unread 08-12-2013, 11:59
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,805
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: Painting and Scheduling

Powdercoating doesn't take us particularly long. If it would ever get in the way we don't do it, but we usually find breaks in the team's meeting schedule to get it done.

We have a sponsor who can turn around a decent number of parts in about a week, and we have our own gun / small oven to do smaller parts in house. We've also paid to have particular parts done overnight at a local auto shop.

It's best to really nail design details in your prototype for the best looking result. Iteration often happens but it doesn't mean you can't paint. At the very worst you just replace a painted part with an unpainted part, not the end of the world.

We had our drive base painted over a few days while we were still finalizing what would go on top of it and how we would attach it to the robot. When the drive base was done we just threw everything together all at once instead of going bit by bit. The manipulator was pretty much done in a night and we paid to have it powdercoated during the next school day, ready to install right after school.

Powdercoating or anodizing isn't super essential but if you find a free few days in your schedule it really isn't that hard to fit in. We probably do way to little prep work (we don't account for powder thickness at all in design, probably should) and it's not very hard for us to throw it all together once it gets in. The trick is to find sponsors for slow turn around work and find cheap places to paint for quick turn around.
__________________
Mentor / Drive Coach: 228 (2016-?)
--2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
.
College Mentor: 2791 (2010-2015)
-- 2015 TVR Motorola Quality, FLR GM Industrial Design -- 2014 FLR Motorola Quality / SFs (with 341, 4930)
-- 2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
-- 2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 MN 10K Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)