On another note, do you think that one or two of
these would be able to hold the weight of the elevator, if I wanted to use 15mm wide 5mm HTD belts? I'm interested in using a belt to drive the first stage (IE, the larger frame that moves) with a steel cable to run the second stage (or carriage) in a two stage, cascaded setup.