With all these posts I have yet to see anyone address HOW the Truss is mounted to the floor. There is nothing that I can see in the drawings that will prevent the truss from tipping over if a robot hits it squarely. If robots attempt to hang from it, there could be a swinging motion, which could tip it over.
FIRST would not put anyone's safety at risk by not providing adequate structural side-to-side support if they intended robots to hang from the truss later down the line. Yes there will be a lot of speculation & a lot of hopeful thinking, but maybe we need to look it square in the face & take it at face value. A truss to toss the ball over & remind teams of the height limit.
If on the other hand I have become narrow-minded, then I will eat my words.
__________________
Mentor & Volunteer
Field setup, Field Supervisor & disassemble Suffield Shakedown 2003- present (2015)
Connecticut Regional Field setup, disassemble & FTAA 2009, 2010, 2011, 2012, 2013 (Field reset & Assistant Field Supervisor), Field Reset Pine Tree Regional 2013, Field Supervisor, setup & take-down at Groton & Southington Districts 2014, Field Reset Hartford District 2014. Field Reset Boston District Championship 2014. FLL Judge Fall 2014
Field Supervisor/Set-up & Take-down Waterbury & Springfield , Field Reset/Set-up & take-down Hartford N/E District 2015. Field Reset NE Champs 2015. FLL Judge Fall 2015.
Suffield Shakedown 2016, Field Super 2016 Stronghold Waterbury.
Last edited by MarcD79 : 05-01-2014 at 22:57.
Reason: clarity
|