View Single Post
  #203   Spotlight this post!  
Unread 06-01-2014, 13:53
kmusa kmusa is offline
Registered User
AKA: Karlis Musa
FRC #0639 (Code Red Robotics)
Team Role: Mentor
 
Join Date: Jan 2009
Rookie Year: 2006
Location: Ithaca, NY
Posts: 117
kmusa is just really nicekmusa is just really nicekmusa is just really nicekmusa is just really nice
Re: The Not So-Secret Secret End-Game

Quote:
Originally Posted by AdamHeard View Post
Considering what the fields cost (hundreds of thousands of dollars), this not a surprise to me at all.

The fact that it's COTS is also nice, as they don't need to get some things designed and welded.

$3k per field is not bad compared to the cost of the above engineering and fabrication time. It's also nothing compared to the cost of the field.
This.

If FIRST wanted a free-standing structure that can span approx 27' [1] without significant droop across the span, that is easily transportable, will withstand balls bouncing off of it, and should survive an occasional impact by a dysfunctional robot, a standard lighting truss is a quick and cost-effective solution.

Just because one could hang 800+ pounds from the center, doesn't mean one must.

-Karlis

[1] Yes, the field is 25' wide this year. Determining if they narrowed it slightly to simplify erecting the truss is left as an exercise for the reader.
__________________
"A society without contrasting ideas will never move forward; however those contrasting ideas must be based on fact, must be rational/logical, and must be presented in a respectful manner." -Arthur Dutra IV

"If the district can spend $1.5M on turf, it should be able to fund a FRC team." -Sophie Halter
Reply With Quote