Quote:
Originally Posted by 42!
Any idea on the current lead time for the 3 cim ball shifter? It says one week right now. Also will WCP be able to keep up with orders this year? The single speed 3 cim gearbox from them seems like a good WCD option to me, but I'm not sure when I'd be able to get it.
|
All of the components for the 3 CIM Ball shifter are in our assembly facility here in Greenville. They are currently being inspected and kitted. We are pushing to have these shipping this week.
We got started on the manufacturing of the WCP items a little later than we wanted. Both WCP and VEX are pretty particular about design details so we released the drawings to production later than we wanted. The dates on the VEXpro website for the WCP items are still our expected ship dates. Please note that this is an
initial inventory problem only. Once the items arrive, WCP, The Robot Space, and VEX will have plenty of inventory for the entire 2014 season.
Quote:
|
Originally Posted by mman1506
Have you released any information for adapting the 2 CIM ballshifter to the VersaChassis?
|
We are working on the application drawings for this and should have them by the weekend.