View Single Post
  #13   Spotlight this post!  
Unread 20-01-2014, 21:47
David Guzman's Avatar
David Guzman David Guzman is offline
Registered User
AKA: Dave
FRC #1251 (The Techtigers)
Team Role: Engineer
 
Join Date: Nov 2004
Rookie Year: 2004
Location: Broward, FL
Posts: 522
David Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant futureDavid Guzman has a brilliant future
Re: pic: More Parts from South FL

Quote:
Originally Posted by jdunston94 View Post
How long did it take to machine those?
There was two programs. The first one was about 15 minutes per plate, this included fly cutting the material on both sides, all counter bores and holes.

The second program used required the fixture plate and took about 30 minutes per plate, this included all pocketing and contouring.

As for the quantities. We actually made 15 one to hang up in our office for decoration, and the other had the wrong size wall thickness and pockets were too deep so we scrapped it.
__________________
Team 1251 The Techtigers
2010 FL Regional Winner (BIG thanks to 86 and 1612)
2009 FL Regional Finalist (BIG thanks to 79 and 744)
2008 FL Regional Winner, FL GM Industrial Design, SC GM Industrial Design
2007 FL Regional Winner, FL GM Industrial Design, Palmetto Regional Finalist, Palmetto Motorola Quality.
2006 Palmetto Regional Winner, Daimler Chrysler Team Spirit Award
2005 FL Regional Judges Award, FL Regional 3rd seeded and finalist, Palmetto Regional Xerox Creativity Award, Palmetto Regional 1st seeded and finalist
2004 UCF Regional Rookie All-star Award
Reply With Quote