Quote:
Originally Posted by techtiger1
All of this supports my thought that FRC has become too reliant on COTS items. 
|
I know this was intended to be somewhat sarcastic, but to those concerned about the impact of COTS on FRC (I'm not one)... these comments remind me there there is still a huge amount of value to building team resources that can machine components and do internal testing.
There is always room for improvement. For example, the VersaChassis tolerances aren't tight enough such that you can just slap rivets on a frame and magically get a perfectly square chassis. We had ~1/8" of runout at 1ft from square after the freshman rivet team had their fun. It probably would have worked, but I had them drill them all out, showed them how to assemble it square, match drill, watch that they weren't twisting the frame as they riveted, etc. Now we are < 1/32" runout at 1ft.
That being said, when the Versa 2x1" was out of stock, our team priced regular 2x1" stock at a local supply house. Same price. Meaning, VEXPro is already beating them on VALUE. Sure they can charge me double for the frame to tighten the tolerances up a bit to make it foolproof, or I can be less foolish.
Same thing goes for other products. I remember reading about motor failures (BAG?) because people were side-loading or thrust loading motor shafts that were never spec'd for those loads. I can either demand VEX make a "more robust" motor that has additional weight and size with internal bearings able to take more abuse... or I can not abuse it.
Another one for us was Delrin washers. We figured out pretty quick that the 1/16" or 1/8" spacers weren't a great value (for us), as we're lucky enough to have a laser cutter that can run 300 to a sheet for 10% of the cost. Not everyone has a 30W laser cutter though. Even then, the thicker ones bloomed too much and the 2" thick spacers were a better value than spanning a several inch gap with a bucket of 1/8" spacers. Same goes for machining, many teams with "free" student/mentor machining time can create parts from raw stock cheaper than VEX. I'm sure VEX would be perfectly willing to sell parts more cheaply to FRC if you will supply them with the parts at a consistent tolerance and free labor to make thousands of them each year.
Back to the OP:
Long story short, if you want to hop on CD to criticize VEXPro (or AM, or any of our other suppliers that cater to FRC)... you would be well off to word your posts more positively. I may share some frustrations, but I also understand what is and is not realistic to expect of both the equipment and the companies at the pricing we receive parts at.