View Single Post
  #15   Spotlight this post!  
Unread 31-01-2014, 12:12
Joe Ross's Avatar Unsung FIRST Hero
Joe Ross Joe Ross is offline
Registered User
FRC #0330 (Beachbots)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1997
Location: Los Angeles, CA
Posts: 8,559
Joe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond reputeJoe Ross has a reputation beyond repute
Re: More than one power distribution board

The 2015 control system continues to use the larger Wago connectors on the PDB. Everything else uses tool-less push-in connectors from Weidmuller. These are the same connectors used on the 2CAN. They require a little practice to get the wire stripped to the correct length, and the wire must fairly straight (too many insertions and removals may require starting over).

Last edited by Joe Ross : 31-01-2014 at 12:20.