|
Re: Pneumatic Wiring
Bosch,
Alan has suggested the method most teams use to get the +24 volts to the module. You can only use one module this way for 24 volt solenoids. The PD power supply was not designed to feed the cRio and other loads. If you use the FIRST breakout, the spacing is the same as PWM connectors. You can make your own with just two position blocks instead of the three position for PWM lines.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
|