Thread: Bagging rules
View Single Post
  #1   Spotlight this post!  
Unread 27-02-2014, 16:31
stevebig stevebig is offline
Registered User
FRC #1502
 
Join Date: Feb 2014
Location: Michigan
Posts: 5
stevebig is an unknown quantity at this point
Bagging rules

I wanted to check on rules for bagging a robot and what can be done with another robot.

Here is the situation that I need verification to see what is possible.

Robot1 is bagged with all it's parts (except electronics board) and weights about 90 lbs at the set bagging date.

Robot2 is also being built one week prior to the bag/tag date but isn't finished and this is how robot1 ended up in the bag. The goal is to make a better robot with better frame and stronger thrower but kids did not finish on time.

So here is the if, Robot2 has many parts removed to get it down to a weight of 45lbs and the other half left together is about the same 45lbs. When Robot 1 bag is opened can we just remove a few small parts from robot 1 and placed on robot2 and then put robot 2 parts back on and then place it in the bag?

Is this within the rules of First?
Reply With Quote