Quote:
Originally Posted by stevebig
This is not at a event, but before the event. Pretty much it would be a wholesale switch of robot1 for robot2 within the 6 hour period allowed before the first event.
|
As long as that switch only uses 45 lbs of unbagged custom/assembled items then you're fine.