View Single Post
  #27   Spotlight this post!  
Unread 14-03-2014, 23:16
Monochron's Avatar
Monochron Monochron is offline
Engineering Mentor
AKA: Brian O'Sullivan
FRC #4561 (TerrorBytes)
Team Role: Engineer
 
Join Date: Feb 2007
Rookie Year: 2002
Location: Research Triangle Park, NC
Posts: 914
Monochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond repute
Re: FRC Blog - It Wasn’t Against the Rules

Quote:
Originally Posted by GaryVoshol View Post
From the few times I could watch today, and in testing last night, at Escanaba there is minimal delay for the pedestals. Sometimes it lights up almost immediately after the ref pushes the end cycle; sometimes it takes 1 or 1.5 seconds.
Pretty sure pedestal delays are still a serious issue. Our team's second match today looked to have a delay of around 30 seconds. A ref and field reset worker eventually physically gave our human player a different ball. Our ref then told our student that if the student could watch the video we took and tell for sure that there was an issue then he would consider taking action. After the student confirmed the issue, nothing was done.

In the same match there was also some assists that failed to get counted for us, but that is just human error and wouldn't have made a difference in the match.

Last edited by Monochron : 14-03-2014 at 23:19.
Reply With Quote