Quote:
Originally Posted by Michael Hill
Al has been adamantly against hot gluing electrical connections because it's apparently "not an industry standard" (though I've seen it a thousand times).
|
We use this
http://eclecticproducts.com/ag_adhesives.htm made by one of our sponsors.
And one of our other sponsors uses to secure electrical connections on the pharmaceutical robots they make.
Quote:
Originally Posted by Ian Curtis
We had a tightly timed loop with no wait in our teleop code that was driving 100% CPU usage. We added a 10ms delay and our CPU usage dropped down to ~75% (on an 8 slot cRio).
|
This can certainly starve the code