Quote:
Originally Posted by blaze8902
So, I heard that Practice matches were on Wednesday this year. Can anyone verify this? That would mean that the time we have in the pits to make modifications would be like...30 minutes after Load-In.
|
2 hours for load-in/work with 5 team members, 3.5 hours with full team (practice matches and inspection).
http://www.usfirst.org/sites/default...hedule-FRC.pdf