|
Re: A Request
I always felt that the challenges faced by a FRC team and a FTC are very different. In my opinion a FTC team works a lot more in engineering mechanisms and project evolution. As a FRC team will work a lot harder with trying to master things like material selection.
My 2 cents. Having larger teams drastically affects how much the FTC teams get noticed compared to a FRC team.
|