Quote:
Originally Posted by llamadon
Thanks! I will definitely inquire of this testing methods. I have read up a small amount on the effects of this number of CIMs on the breaker and have heard of a few blow outs. These blow outs tend to happen in an immediate change in voltage. IE. driving the robot forward and then immediately going backwards. Teams have implemented a part in the code that does not allow this immediate jump from 0 to 100 percent, and instead ramps it up steadily.
|
Well we only tripped the breakers a few times on our shooter, lol. Load testing would be neat. I think we have a load tester in the cave actually, I saw it the other day.