View Single Post
  #29   Spotlight this post!  
Unread 08-08-2014, 01:39
asid61's Avatar
asid61 asid61 is offline
Registered User
AKA: Anand Rajamani
FRC #0115 (MVRT)
Team Role: Mechanical
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Cupertino, CA
Posts: 2,217
asid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond reputeasid61 has a reputation beyond repute
Re: pic: 4WD Concept

Quote:
Originally Posted by AdamHeard View Post
For 1:1 ratios, the math becomes dead simple. For Chain, the c-c must be a multiple of the chain pitch (.25 for #25, .375 for #35). It can be a multiple of the half pitch if you're willing to use a half link.

For belt, it must be a multiple of the half pitch (BUT don't assume all belts are sold!). Required toothcount on the belt (B) is;

B = T + 2*C-C/P

T = Pulley toothcount
C-C = Center to center (in same units as P!!!)
P = Pitch (in same units as C-C).

For both chain and belt there are arguments for adding a fudge factor to the c-c. I generally don't for shorter distances, but will more commonly do so for longer distances (or for small pitch belts).
If you have multiple sizes or want to save time, you can just use a chain length calculator: https://www.rbracing-rsr.com/chainlength.html
Reply With Quote