View Single Post
  #11   Spotlight this post!  
Unread 18-06-2001, 10:35
Andy Baker's Avatar Woodie Flowers Award
Andy Baker Andy Baker is offline
President, AndyMark, Inc.
FRC #3940 (CyberTooth)
Team Role: Engineer
 
Join Date: May 2001
Rookie Year: 1998
Location: Kokomo, Indiana
Posts: 3,412
Andy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond reputeAndy Baker has a reputation beyond repute
Send a message via AIM to Andy Baker
IRI only needed field controllers and a bit of hardware

For the IRI, we only used a few components from FIRST. We had our own field and bridge, so we only borrowed these components:

field controllers & switchbox
e-stop switches
electronic number displays (for team numbers and time)

They didn't require us to give them a deposit, probably because we only used this partial system. Also, like I said above, we did do some debug with the field controllers and switchbox.

Andy B.
Reply With Quote