
28-11-2014, 23:03
|
|
Registered User
 FRC #0857 (Superior Roboworks) FTC 10723 (SnowBots)
Team Role: Mentor
|
|
Join Date: Jan 2011
Rookie Year: 2007
Location: Houghton, MI
Posts: 1,098
|
|
|
Re: Pneumonic systems
Quote:
Originally Posted by daniel12997
Check each connection for leaks before putting it on the robot
|
To expand on this: a soap/water mixture applied to joints will bubble if there is a leak (with the system under pressure).
__________________
2015-present: FTC 10723 mentor
2012-present: 857 mentor
2008-2011: 857 student
2015: Industrial Design, Excellence in Engineering, District Finalist, Archimedes Division (#6 alliance captain)
2014: Judges Award, District Engineering Inspiration, District Finalist, Galileo Division
|