View Single Post
  #17   Spotlight this post!  
Unread 21-01-2015, 12:12
RonnieS's Avatar
RonnieS RonnieS is offline
Just a tad washed up
AKA: Ronnie Sherrer
FRC #0314
Team Role: College Student
 
Join Date: Jan 2013
Rookie Year: 2006
Location: Flint/Warren
Posts: 389
RonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond reputeRonnieS has a reputation beyond repute
Re: pic: 4242 Preliminary CAD 1

Quote:
Originally Posted by apm4242 View Post
It looks like you will be running chain? Make sure you have a proper way to tension those giant runs. My vote would be to look at putting a tensioning device in the middle of your chain run. You will already be anchoring your carriage so doesn't seem to be too big of a deal, would even look at having it build into how it attaches to your carriage.

Second, I would put a cross support. Doesn't have to be directly on uppers but maybe on the angled back support braces.

Lastly, I love the ramp idea. I would look into seeing how you can stack them quick from the human loader station. Maybe by having a ramp with pistons on bottom that let one slide to floor then it raises up enough to clear first tote and slides the second tote right on top. I know our team will be looking for those robots that can make quick pre stacks.
-Ronnie
__________________
"Do not argue with an idiot. He will drag you down to his level and beat you with experience"
Reply With Quote