View Single Post
  #1   Spotlight this post!  
Unread 06-02-2015, 22:30
AustinShalit's Avatar
AustinShalit AustinShalit is offline
Registered User
AKA: אוסטין
no team (WPILib Suite Developer)
 
Join Date: Dec 2013
Rookie Year: 2008
Location: Los Angeles/Worcester/Israel
Posts: 125
AustinShalit is a glorious beacon of lightAustinShalit is a glorious beacon of lightAustinShalit is a glorious beacon of lightAustinShalit is a glorious beacon of lightAustinShalit is a glorious beacon of lightAustinShalit is a glorious beacon of light
2015 FRC Inspection Checklist

As part of the 2/6/15 Team Update the Inspection Checklist was posted.

I have a few questions that I am hoping will be addressed in a new revision of the list.

Regarding Wire Colors, can green be added as an appropriate color for the return wires? This is the color of the return wire built into the Talon SRX and Victor SP. (This should also be added to the rules)

For Compressor Power, the inspection checklist says “under control of the robotRIO”. Is this different from the rules, “must still be controlled and powered by the ROBOT”?

During the Power On Check, Confirm Pneumatics Operation - Does this mean that we have to have the compressor start when the robot is first enabled? What if we do not want it to?
__________________
Reply With Quote