View Single Post
  #13   Spotlight this post!  
Unread 17-02-2015, 20:31
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,774
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: We need help... A lot of it

Quote:
Originally Posted by Sperkowsky View Post
I think I need to find more detailed pics that show the pulley system better. Because I think it's slightly confusing what we actually tried to do.
Nope, I think I understand you. The cable is terminated to a moving plate on the elevator, on both ends, and the rest of it moves through associated pulleys to the drum, where it wraps around once and continues to the other termination point via more pulleys if needed. See my last post.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote