FrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond reputeFrankJ has a reputation beyond repute
Re: 60 second set-up / pack-up time?

Quote:
Originally Posted by Lil' Lavery View Post
We originally felt similarly, until re-reading the rules. We determined that the second valve would fall under R66-F, as a flow control valve.
Realizing it the LRI at the competition that will be making the ultimate call...
When using a "flow control valve" as a "blocking valve" it ceases being a "flow control valve" and is no longer legal. While not even predicting if the GDC would answer a question about this, the logic is similar to what they used in the past.

Using a quick connect fitting is a good idea, but they are essential check valves which are not legal. Of course if it is considered to be an integral part of an legally allowed connecting fitting...