|
Re: 2015 Between-Match Delays
Transportation configuration is a big part of the delays. Some teams need to dis-assemble parts of their robot before they can remove their robot from the field and some robots in the next batch of teams need to get their robot ready for the start of the match.
Add in the usual field delays of getting robots connected and it gets hard to stick to the match schedule for time.
|