Quote:
During the event, from load-in on the first day to load-out on the final day, Teams may only produce FABRICATED ITEMS in the
pit areas or provided machine shops, as defined in the Administrative Manual, Section 4.8: The Pit, and per R17 in Section 4.6:
Material Utilization.
|
It does not specify YOUR pit, it specifies the pit areas.