View Single Post
  #22   Spotlight this post!  
Unread 07-05-2015, 16:04
Monochron's Avatar
Monochron Monochron is offline
Engineering Mentor
AKA: Brian O'Sullivan
FRC #4561 (TerrorBytes)
Team Role: Engineer
 
Join Date: Feb 2007
Rookie Year: 2002
Location: Research Triangle Park, NC
Posts: 920
Monochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond repute
Re: Design Help for offseason bot

Quote:
Originally Posted by Sperkowsky View Post
We have a water jet cutting sponsor that we haven't used yet. Those plates may be a good time
My comment was actually the opposite of that. You can get plates made yourself, but my comment was about the actual assembly of the elevator, not the plates holding bearings or rollers. You can buy plates and rollers if you like, but the actual structure of the elevator needs to have tight tolerances as well.

There is a lot of focus on making sure rollers are tightly toleranced in elevator design, but don't forget to make your structure tightly toleranced as well. Our structure was a little bit out of square and it caused a lot of flexing and bending.
Reply With Quote