Quote:
Originally Posted by z_beeblebrox
How are your access points for belt in tube set up? How is it assembled?
|
Above is an image of 192's 2014 base about to be welded up. There are two rectangular holes on the tops of each side as well as 4 holes in the side in addition to the bearing holes. First the belts go in the rectangular holes in the top, then the pulleys are slid into the side holes and rolled down the tube to their bearings holes. The gearbox is put on, axles are put through the pulleys, bearings popped in, and wheels are put on. Assembly time is about 5 minutes a side.