Quote:
Originally Posted by bkahl
How do I put this on my Bill of Materials?
|
At the
riskcost of dark humor at Comedy hour, there are two ways of doing this:
- Include the fair market cost of tenderization by the butcher shop/dog food canner sponsor in the cost of the now "tenderized horse meat" reported on the BoM
- Sign up the butcher's tenderizer guy in TIMS as a mentor and ignore it as it falls within the parentheses under (2015) R11:
Quote:
|
Originally Posted by 2015 Game Manual
R11 The BOM cost of each non-KOP item must be calculated based on the unit fair market value for the material and/or labor, except for labor provided by Team members (including sponsor employees who are members of the team), members of other Teams, event provided Machine Shops and shipping
|
As I look at the preview, I'm not sure which is the joke or whom the joke is upon
