|
Re: Mythical Six Week Build Season
Quote:
Originally Posted by Michael Corsetto
Blake,
You are completely right, there is an overwhelming evidence that adjusting the days on the calendar is not the only dimension for "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)".
My question is:
Will removing stop-build be one of the many "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)", or is it one of the "ways-to-NOT-improve-build-seasons (and the students and the robots that build-seasons produce)"?
I am proposing this:
Removing stop-build is simply one of many "ways-to-improve-build-seasons (and the students and the robots that build-seasons produce)"
...
-Mike
|
A) because I believe lengthening the build season is so unlikely (for an overwhelming majority of the teams) to affect the root causes and symptoms that people are hoping to affect, and
B) because I focus on FIRST's as a program that uses competitions, but doesn't exist to *be* competitions; I think we should park lengthening-the-build-season in the examined-but-rejected-because-of-very-low-ROI pile.
We/FIRST have better/bigger fish to fry. YMMV
Blake
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
|