
20-11-2015, 22:34
|
 |
 |
Technical Director
AKA: Gus Michel II
 FRC #3946 (Tiger Robotics)
Team Role: Mentor
|
|
Join Date: Jan 2014
Rookie Year: 2013
Location: Slidell, LA
Posts: 3,577
|
|
|
FRC every-team canvas
This thread was created to build up a questionnaire for every FRC team, to be answered through pit scouting performed by a CD volunteer (or someone voluntold by a CD denizen). I'd like to keep this to at most twenty questions, answerable in about 10 minutes per team. Here's my initial cut; please recommend additional questions or options within the questions, or point out questions that you believe will produce unusable or meaningless results. I specifically did not ask about the team's total budget, because most team members (at least on my team) have no idea. - What's your team number? (does not count as one of the twenty)
- How many Pre-college Members do you have?
- Total number of members
- Number of "all-in" members (90%+ of build sessions)
- Number of "sporadic" members (50%- of build sessions)
- How many college or adult Mentors (includes Coaches) do you have?
- Total number of mentors
- Number of "all-in" mentors (90%+ of build sessions)
- Number of "sporadic" mentors (50%- of build sessions)
- Which of the following shop tools does your team have direct access to?
- Hand drills
- Hand-held powered saw (circular, reciprocal, and/or jig)
- Portable band saw
- Drill Press
- Chop Saw
- Table Saw
- Band Saw (fixed)
- Water Jet cutter
- Sheet Metal brake
- Lathe
- Mini-mill
- Manual Mill
- CNC mill
- Plasma/laser
- Other (specify)
- Which of the following sponsored manufacturing techniques do you have access to? If you know, about how many hours of each?
- Sheet Metal Fabrication
- Sheet Metal cutting (whether water, laser, or mill)
- Full milling of solid stock (manual or CNC)
- Other (specify)
- Do you contract any of your manufacturing beyond your sponsors? If so, which? If you know, how many hours (or dollars) of each?
- Sheet Metal Fabrication
- Sheet Metal cutting (whether water, laser, or mill)
- Full milling of solid stock (manual or CNC)
- Other (specify)
- What is your team's top-level organization?
- one school
- multiple schools or school board
- community
- charitable foundation
- other (specify)
- Do you build a prototype robot? If so, about how many?
- Do you build a practice/twin/clone robot? If so, how many?
- How many (non-CMP, non-DCMP) events is your team competing in?
- Total Events from week 0 to pre-DCMP?
- How many of those events require your team to get hotels or other housing?
- How many require your team to rent a bus or buy group ground transport?
- How many require your team to travel by air?
- How many hours per week of combined build, practice, training, and programming does your team average (as a team or large group):
- between kickoff and stop build
- between stop build and first event
- between first and last event
- between your last event and the end of summer (Aug/Sep)
- in the fall (Aug/Sep to kickoff)
- How many "major sponsors" does your team have? Approximately how many dollars of donation (include labor at what you believe to be a fair rate) does it take to be a "major" sponsor?
__________________
If you can't find time to do it right, how are you going to find time to do it over?
If you don't pass it on, it never happened.
Robots are great, but inspiration is the reason we're here.
Friends don't let friends use master links.
|