View Single Post
  #6   Spotlight this post!  
Unread 18-12-2015, 18:54
GeeTwo's Avatar
GeeTwo GeeTwo is offline
Technical Director
AKA: Gus Michel II
FRC #3946 (Tiger Robotics)
Team Role: Mentor
 
Join Date: Jan 2014
Rookie Year: 2013
Location: Slidell, LA
Posts: 3,575
GeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond reputeGeeTwo has a reputation beyond repute
Re: 610's Preseason Drive

Quote:
Originally Posted by Avram Kachura View Post
Yes, it is held together by 1 threaded rod and 2 slots cut out on the CNC Mill
for alignment. http://imgur.com/a/ldUfC
Why was this piece made with the large flange? It appears to me that you could have used a smaller piece of stock and put all three holes inside the depression. With the belly pan installed, the large flange does not seem to be necessary to provide right-angle rigidity.

Also, when we used threaded rod to provide tension on a project a couple of years ago, we found it neater to use two bolts, two threaded coupling nuts, and a length of threaded rod a few inches shorter than the run, all of the same thread/pitch. This is less likely to snag on other parts, as there are no protruding bolt ends, just a hex head or socket cap.
Edit: This solution would obviously not work on your three-roll-pins-plus-rod method, but should do well with the rod running down the middle like this.
__________________

If you can't find time to do it right, how are you going to find time to do it over?
If you don't pass it on, it never happened.
Robots are great, but inspiration is the reason we're here.
Friends don't let friends use master links.

Last edited by GeeTwo : 19-12-2015 at 10:34.