View Single Post
  #22   Spotlight this post!  
Unread 27-12-2015, 01:25
pilleya's Avatar
pilleya pilleya is offline
Elec+Mech
AKA: Alastair Pilley
FRC #4613 (Barker Redbacks)
Team Role: Mechanical
 
Join Date: May 2015
Rookie Year: 2013
Location: Sydney, Australia
Posts: 426
pilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond reputepilleya has a reputation beyond repute
Re: pic: Recycle Rush Re-design Part 2

Quote:
Originally Posted by GeeTwo View Post
I am 99+% certain that the GDC would consider a switching power supply which steps up from ~9V to ~12V would constitute "directly altering the power pathway"
Thanks for clarifying the meaning of Power pathway. I thought that it meant that must be a direct pass-through without being interrupted by a sensor or relay etc. I was taking it in a rather literal sense.
Reply With Quote