Re: Team Drawing Field BOM?
Quote:
Originally Posted by msonnier
I'm pretty sure your quantities of pipe clamps, bolts and nuts for Cheval de Frise are wrong.
There are 4 teetering platforms, each of which needs 2 pipe clamps and each pipe clamp needs 2 bolts and nuts.
Therefore under miscellaneous for CdF I think it should be:
(8 x) pipe clamp, cheval de fries
(16 x) flat head screw, 3/8-16 x 1.25”
(16 x) nut, nylock 3/8-16
Thanks for putting this list together.
|
It looks like you're right, I had only accounted for two of the platforms. Thanks for the correction! I have edited my original post to fix this.
__________________
[2009-2013]: Team 1676 Student, Co-CEO, Carpentry Lead
[2013-Present]: Team 1676 Alumnus/College Mentor
Won: 2010 New Jersey Regional, 2010 Virginia Regional (undefeated), 2011 New Jersey Regional, 2011 Virginia Regional, 2011 Brunswick Eruption, 2012 Rutgers MAR District, 2012 girlPOWER, 2012 Ramp Riot, 2013 Bridgewater-Raritan MAR District, 2014 girlPOWER, 2015 Bridgewater-Raritan MAR District, 2016 Mt. Olive MAR District, 2016 Bridgewater-Raritan MAR District
2016 Season Recap Video: http://tinyurl.com/1676-2016
Facebook Instagram Twitter YouTube
|