|
⁶ CIM drive-train brown out
I have been talking about brownout problems with our drive train design, but no one seems to listen. I have attached the picture of what we were planning. #1 It is a 6 CIM drive train. #2 The CIMs are spaced out (longer wiring) #3 We will sometimes be running 2 mini CIMs or a bag motor along with it.
|