|
Re: Manning Robotics | Week 3 Timelapse 2016
They are in fact building a stacked electrical board. The plan is that the whole system is going to have plugs in each wire so that if a part needs to be replaced, then its just a matter of seconds to get it out. Also the levels will be able to slide out giving fast access to lower levels. For the lights, the majority of the box is being made out of plexy-glass so that you can see in.
|