
17-02-2016, 22:29
|
|
Registered User
 FRC #0857 (Superior Roboworks) FTC 10723 (SnowBots)
Team Role: Mentor
|
|
Join Date: Jan 2011
Rookie Year: 2007
Location: Houghton, MI
Posts: 1,104
|
|
|
Re: Charged system during inspection?
Quote:
Originally Posted by Daynater
Hi guys, (hopefully) quick question. During inspection can we have our pneumatic loop charged to keep an arm or other extending device constrained with in the frame perimeter, or can it be empty and then we prove that it can stay inside the perimeter for the starting configuration?
|
You may want to have a bungee cord or latch of some kind to hold it up without air at times. However, be careful to unlatch such a thing before matches.
__________________
2015-present: FTC 10723 mentor
2012-present: 857 mentor
2008-2011: 857 student
2015: Industrial Design, Excellence in Engineering, District Finalist, Archimedes Division (#6 alliance captain)
2014: Judges Award, District Engineering Inspiration, District Finalist, Galileo Division
|