View Single Post
  #4   Spotlight this post!  
Unread 17-02-2016, 22:29
Christopher149 Christopher149 is offline
Registered User
FRC #0857 (Superior Roboworks) FTC 10723 (SnowBots)
Team Role: Mentor
 
Join Date: Jan 2011
Rookie Year: 2007
Location: Houghton, MI
Posts: 1,098
Christopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond reputeChristopher149 has a reputation beyond repute
Re: Charged system during inspection?

Quote:
Originally Posted by Daynater View Post
Hi guys, (hopefully) quick question. During inspection can we have our pneumatic loop charged to keep an arm or other extending device constrained with in the frame perimeter, or can it be empty and then we prove that it can stay inside the perimeter for the starting configuration?
You may want to have a bungee cord or latch of some kind to hold it up without air at times. However, be careful to unlatch such a thing before matches.
__________________
2015-present: FTC 10723 mentor
2012-present: 857 mentor
2008-2011: 857 student

2015: Industrial Design, Excellence in Engineering, District Finalist, Archimedes Division (#6 alliance captain)
2014: Judges Award, District Engineering Inspiration, District Finalist, Galileo Division