|
Re: Al's 2016 Inspection Thread
R89 Any pressure vent plug must be:
A. connected to the pneumatic circuit such that, when manually operated, it will vent to the
atmosphere to relieve all stored pressure in a reasonable amount of time, and
B. placed on the ROBOT so that it is visible and easily accessible.
When you place it downstream from the regulator is takes longer to release all pressure so that is why most people put it upstream.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.
|