3250 utilized a grappling hook and winch mechanism that proved to be highly effective. It did require precise alignment on the tower base to engage the hook. The thing I think that worked best about the design was the speed of the climb, less than 10 seconds from deployment:
https://youtu.be/47A-pXj1Ik4