View Single Post
  #8   Spotlight this post!  
Unread 17-04-2016, 21:26
jman4747's Avatar
jman4747 jman4747 is offline
Just building robots
AKA: Josh
FRC #4080 (Team Reboot)
Team Role: CAD
 
Join Date: Apr 2013
Rookie Year: 2011
Location: Atlanta GA
Posts: 418
jman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond reputejman4747 has a reputation beyond repute
Re: Is CAD essential to all teams?

Quote:
Originally Posted by abhishekmalle View Post
How soon is the CAD model done during the season? Or is it a continuous process where as soon as the CAD is done, the building of that part is undertaken?
It depends on how you are making your parts and what your resources are. This year we acquired a sheet metal fabrication sponsor on top of milling and turning ops we already had access to. Anything we wanted done in sheet metal needed to be sent off in one big order as based on the lead time we wouldn't have parts we sent of later back in time. The milled/turned parts could be made almost on the fly and get back in less than a week so we were able to iterate more with those.

It all depends on your specific situation. And you don't have to use CAD to make a complete 3D model of the robot. Even dimensions on a 2D sketch overlaid on to the kit chassis model can be a very valuable tool during fabrication.
__________________
---------------------
Alumni, CAD Designer, machinist, and Mentor: FRC Team #4080

Mentor: Rookie FTC Team "EVE" #10458, FRC Team "Drewbotics" #5812

#banthebag
#RIBMEATS
#1620
Reply With Quote