View Single Post
  #7   Spotlight this post!  
Unread 02-05-2016, 13:48
JesseK's Avatar
JesseK JesseK is offline
Expert Flybot Crasher
FRC #1885 (ILITE)
Team Role: Mentor
 
Join Date: Mar 2007
Rookie Year: 2005
Location: Reston, VA
Posts: 3,624
JesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond repute
Re: New Off-season Defenses

Conveyor roller bridge of despair. PVC pipe around steel may work? Rough length the average wheel base at the event - probably something like 24-28". Peak height is close to the rock wall's height.

A rock wall made out of a roll of carpet that is allowed to deform over the course of a competition.

A quarter-height drawbridge with less spring force - most teams could probably add something to their CDF manipulators to solo this from the neutral zone.

2 punching bags or a few steel vertical pipes attached to a "high bar"

Rough terrain with 1" more variation in the height.
__________________

Drive Coach, 1885 (2007-present)
CAD Library Updated 5/1/16 - 2016 Curie/Carver Industrial Design Winner
GitHub
Reply With Quote