View Single Post
  #27   Spotlight this post!  
Unread 08-05-2016, 01:30
Monochron's Avatar
Monochron Monochron is offline
Engineering Mentor
AKA: Brian O'Sullivan
FRC #4561 (TerrorBytes)
Team Role: Engineer
 
Join Date: Feb 2007
Rookie Year: 2002
Location: Research Triangle Park, NC
Posts: 887
Monochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond reputeMonochron has a reputation beyond repute
Re: Waterjet vs. Manual Build Process?

It will entirely depend on the resources that your team currently has. For our team we split the workload between tasks that needed high precision, and those that could get by on COTS parts or with less precision. The team did manual fabrication on the latter while our sponsor machined the parts that we had designed. The design + CNCing took roughly the same amount of time as the manual fabrication did, so we were able to move to integration much quicker than before.
__________________


2016 | Innovation In Controls, Industrial Design, Quality Award, NC District - 4th Seed
Reply With Quote