
20-05-2016, 16:25
|
 |
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
|
|
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,935
|
|
|
Re: What can FIRST do to increase FRC team sustainability?
Quote:
Originally Posted by Knufire
I know IndianaFIRST surveyed teams ...
|
Do you have a more detailed breakdown of the numbers that would show if the teams were 10-year veterans that hit a major rough patch, or were 2-year hot-house orchids that wilted on the first sunny day because they didn't have a good root system?
There is a heck of a big difference in those two extremes of that spectrum (and I realize that the crudely defined spectrum I have in mind is only one method among the many ways to categorize teams).
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
|