|
Re: What can FIRST do to increase FRC team sustainability?
If anything, simplifying the build goals, the build expenses, and the time spent attempting to carry them out is what a struggling team needs; not a double dose of each.
The first FRC seasons are big meals to eat in one gulp if you are a young/rookie team that didn't first cut your teeth on an simpler challenge.
Simplify and constrain, instead of pushing in the direction of increased complexity (veterans will use time to create complexity and consistency - rookies will have even more problems than they do now if they want to keep up - time won't solve those problems).
I know there is a strong community that wants to push FRC as far as possible in the Formula One direction (and use more build time to do it), but if rookies and veterans are on the same field, that's not the way to avoid overloading, overworking, and overwhelming the rookies.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Last edited by gblake : 05-20-2016 at 11:52 PM.
|