|
Re: [FIRST EMAIL] Stop Build Day Survey
Quote:
Originally Posted by AllenGregoryIV
Most of the elite and many of the mid tier teams in FRC are already building well past the end of the season. WITHHOLDING ALLOWANCE, multiple competitions, practice robots, etc Allow teams like mine to barely notice "Stop Build Day" at all. The elite teams aren't putting their tools down after build season is over they are finding ways to attend 3+ competitions before Championships and they are scrimmaging with near by teams on the other weekends with their practice robots to get even better. Any team that isn't putting in more time after build season is either choosing not to or doesn't have the resource to do it. "Stop Build Day" isn't keeping low resource teams competitive it's dramatically removing their ability to iterate and perfect their designs. It's stopping them from the awesome of experience of practicing with friends and learning from them without the pressure of a competition. It's stopping volunteers from holding pre-inspection nights leading up to events to get teams ready for inspection and allow them to fully utilize the limited practice time at events. "Stop Build Day" needs to be abolished.
|
+1
__________________
"The best way to predict the future is design it"
"Striving for excellence through inspiration"
|