|
Re: [FIRST EMAIL] Stop Build Day Survey
Quote:
Originally Posted by Joe Johnson
|
Nah. Not so much.
Scoring points in matches is simply not the correct proxy/metric to use to gauge the success of FRC teams.
There are at least two kinds of people in the world. I am one kind.
Side note, I'm really, really growing weary of seeing the words "competitive" and "elite" in discussions like this. To me they are red flags. YMMV.
PS: I hope FIRST soon realizes the survey's results will be worse than useless. They will be harmful, not neutral or helpful.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Last edited by gblake : 08-09-2016 at 00:08.
|