|
Re: [FIRST EMAIL] Stop Build Day Survey
Quote:
Originally Posted by AllenGregoryIV
Taken from Jim Zondag's excellent paper. Discussion on the paper is here.
Claiming six weeks when so many teams use the WITHHOLDING ALLOWANCE, practice bots, multiple competitions, and more to extend their build season isn't just PR cover up, it's a lie.
|
OK. Change/fix it by eliminating those things.
Eliminating SBD is hardly the only course available.
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
|