|
Re: [FIRST EMAIL] Stop Build Day Survey
Quote:
Originally Posted by Sperkowsky
11 posts and we are all anxious to hear your opinions. Too bad all we have been getting are sighs.
|
Instead of updating the "sigh" post, I'll create this one
There was a recent thread on team sustainability: here
Someone using the ID Sperkowsky participated in that thread: here
Someone using the ID gblake participated in that thread:
here, here, here, here, and here, and in other places.
I found those by searching for "build season".
Brandon,
I agree. One suggestion I made recently is in the links above. It is the one I would put at the top of my list of things to try. There are others that are different or are variations on that theme.
Blake
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Last edited by gblake : 08-09-2016 at 14:34.
|