View Single Post
  #269   Spotlight this post!  
Unread 08-09-2016, 15:15
Oblarg Oblarg is offline
Registered User
AKA: Eli Barnett
FRC #0449 (The Blair Robot Project)
Team Role: Mentor
 
Join Date: Mar 2009
Rookie Year: 2008
Location: Philadelphia, PA
Posts: 1,047
Oblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond reputeOblarg has a reputation beyond repute
Re: [FIRST EMAIL] Stop Build Day Survey

Quote:
Originally Posted by waialua359 View Post
Sorry, have to argue this one. We do Week 1 events and we barely have enough time to get our robot and our team prepared to the event. Some of us still have to fly to events, including our robot.
Normally our robot is shipped out either on the last day of build season or the next.
Oh, I'm not defending that as a viable option, at all - the logistical problems are likely insurmountable.
__________________
"Mmmmm, chain grease and aluminum shavings..."
"The breakfast of champions!"

Member, FRC Team 449: 2007-2010
Drive Mechanics Lead, FRC Team 449: 2009-2010
Alumnus/Technical Mentor, FRC Team 449: 2010-Present
Lead Technical Mentor, FRC Team 4464: 2012-2015
Technical Mentor, FRC Team 5830: 2015-2016
Reply With Quote