I figured I'd chime in here. 148 was fortunate enough to be given space in a new Career and Technology wing that was added to our high school. In May of 2014 our community voted yes on a $79 million bond to upgrade all technology in the district, tear down and rebuild an elementary school, do much needed maintenance work on all campuses and build a CTE wing onto the existing high school. In that wing we were given about 8000 sqft for a competition arena, a build area, a small machine shop, and a classroom. I have some drawings of the building if anyone is interested but the pictures speak much louder than the drawings! Here is an album of how it looks today. We are still under construction a little, and have a lot more to set up but this gives you a good idea of the space.
https://goo.gl/photos/yqpM27rvg43dW4rv7
Please feel free to contact me with any questions.